Home inspection acceptance must know the key

<<<Links: Eight Suggestions for Decreasing the Total Cost of Manufacture

1. At the scene, the owners, designers, project supervisors, and construction managers will participate in the four parties' participation. The purpose is to explain the budget items, drawings, special techniques, and coordinate the relevant procedures to the responsible person on the site.

2. Material acceptance The formal home improvement company needs the owner to check the material before placing it on the construction site. At this time, the industry mainly pays attention to whether it is consistent with the details of the materials on the contract. Only after the owner signs the decoration company can the construction be carried out.

3. Mid-term acceptance In the mid-term acceptance, the owner not only identifies the overall effect of the decoration, but it is more important to check whether the construction quality of the construction is satisfactory. Generally, the following aspects are to be followed.

First of all, check whether the lighting circuit is in line with the regulations, sockets, lighting switches, main gates, leakage switches, etc. must have a certain height, kitchen, air conditioning should use a dedicated line to avoid mutual interference and produce a magnetic field. The television antenna and telephone line should be installed in a convenient maintenance location; secondly, check whether the drainage is smooth, with or without leakage, backflow, and water accumulation; whether the high-grade plumbing hardware is scratched; and then check whether the new stacking wall is vertical or not. Whether the horizontal plane is the same and whether the joints are even and tidy. Finally check the paint quality, it should be smooth, feel good, and no cracks, at a meter looks no color and nail. The mid-term acceptance requires owners, designers, project supervisors, and construction managers to participate in the inspection. After the acceptance, the quality report can be signed and confirmed.

4. The acceptance of the tail period requires the participation of the owners, designers, project supervisors, and the person in charge of the construction. The overall acceptance of the engineering materials, design, and process quality must be confirmed after signing up.

Construction acceptance decoration design switch TV decoration socket home decoration decoration company