Toilet installation process

One is a wall tile. The second is sanitary ware.

>>> Link: Reasonable allocation of time to find out the whole process of renovation


(1) Construction process flow <br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br>

1. The toilet's process flow Check the ground drain pipe → align the nozzle → flatten the alignment → draw the mark → punch the hole → put the putty → cover the rubber pad → screw on the nut, → the two sides of the water tank Hole painting imprint, →Drilling →Insert bolts →Clamping →Hydraulic tank hanging flat alignment →Tighten the nut →Installing the backwater tank water elbow →Install the eight-word door →Make the fork of the mother lamp bent →Insert the drift gate and Eight-word door → tighten the nut.

2. The process of washbasin expansion bolt insertion → 捻 → → → pelvis rack hanging → put the basin on the shelf to find the formation → the water connection: washbasin → straightening → Sheung Shui connection.

3. Bathtub process process Tub installation: → Launch → Putty tightly closed → Sheung Shui installation → Try to find

4. The process flow of the shower The cold and hot water nozzles are leveled with test tubes → Measure the short section size → Install on the mouth of the mouth → Apply brass to the water inlet of the shower, Apply the nut → Tighten the nuts → Fix the wall → Upper copper The pipe is mounted on the three-way port → wood screws are fixed to the wall.

5. The process flow of the bidet mixer switch, the door cover and nuts of the hot and cold water doors are leveled, → The water gate is installed → The nozzle is turned and the core door is installed → The hot and cold water door outlet nut is tightened → The hybrid switch nut is tightened → Installed three Water gate door cover → magnetic bowl is installed → When nozzle is installed → Install the water outlet → When the handle is installed → Adjust the positioning.

(b) Construction essentials
1. Wash basin installation construction essentials:

(1) Sink basin products should be flat and lossless. Drain plugs shall have overflow holes of not less than 8mm diameter.
(2) Drain plugs and sinks When connecting, the drain plug overflow hole should be aligned with the overflow hole of the sink basin as much as possible to ensure that the overflow site is unblocked. The top surface of the drain plug should be lower than the bottom of the wash basin after being attached.
(3) Bracket fixing bolts may be galvanized bolts or galvanized metal expansion bolts of not less than 6mm (if the wall is perforated, expansion bolts are strictly prohibited).
(4) After connecting the sink with the drain pipe, it should be solid and dense, and it is easy to disassemble. The joint must not be exposed. The sinks are applied with silicone paste at the wall contact points.
(5) If sink drainage traps and taps are plated products, the coating must not be damaged during installation.

2. Tub installation method:
(1) When the apron tub is installed, the bottom of the apron shall be close to the ground, and a 250-300mm hole shall be reserved in the drainage place of the floor slab to facilitate drainage installation. A manhole shall be provided at the end wall of the bathtub drain.
(2) Other types of bathtubs can determine the height of the tub on the basis of relevant standards or user requirements. Then install the tub after laying two brick bases. For example, the side of the bath tub should be installed with a manhole or a manhole at the drain end wall.
(3) The height of various hot and cold faucets or mixer taps shall be 150mm higher than the upper plane of the bathtub. The chrome plating should not be damaged during installation. Chrome plated cover should be close to the wall.
(4) The height of the fixed shower and hose shower can be installed according to relevant standards or according to user's requirements.
(5) The installation plane of the bathtub must be calibrated with a horizontal ruler and must not be sideways. The joint between the side of the bathtub and the wall is filled with sealant and compacted.
(6) The connection between the tub drain and the drain pipe should be solid and compact, and it is easy to disassemble and the joint must not be exposed.

3. Toilet installation points
1) The height of the water supply pipe is usually 250mm from the ground to the center of the valve. If the one-piece toilet is installed, the height of the water inlet of the toilet shall be determined, but not less than 100mm. The center of the water supply valve is generally in the sewer pipe. 150mm to the left of the center or position based on the actual size of the toilet.
2) The low tank toilet uses galvanized bolts or galvanized metal expansion bolts in the tank. If the wall is a perforated brick, expansion bolts are strictly prohibited. A soft gasket should be used between the tank and the nut. It is forbidden to use a metal hard plate.
3) The water tank should be no more than 20mm away from the wall of the water tank and one-piece toilet.
4) The installation of the toilet shall not be less than 6mm galvanized expansion bolts, the soft washer shall be used between the toilet and the nuts, and the sewage pipe shall be exposed to the ground 10mm.
5) When the toilet is installed, put the putty around the bottom drain first, then slowly align the discharge outlet of the toilet with the sewage pipe and press it down to fill the flat surface. Then tighten the gasket nut and remove it. Putty, with a putty filling around the base immediately after cleaning with a wire or wipe.
6) The height of the overflow pipe in the flushing tank should be 30~40mm lower than the wrench hole to prevent water overflow from the wrench hole when the inlet valve is damaged.

(III) Precautions
1. Do not damage the waterproof layer. If there is damage or no waterproof layer, waterproof should be done first, and 12 hours of water leakage test.
2. Sanitary ware is firmly fixed and the pipe connections are tight.
3. Pay attention to finished product protection and prevent bumping sanitary ware.

Decoration process faucet switch socket