Home improvement waterproof, you must know the "three disciplines" and "eight items of attention"

How important is waterproofing in decoration? We all know how waterproof construction should be done. The following will be summarized as "three major disciplines and eight items of attention"! Three disciplines 1. Do a good job in the basic treatment in the bathroom, kitchen, balcony and other areas that need to be waterproof, carefully check the wall and the ground, there are gaps, cracks, inequality defects, repair and smooth with cement mortar. In particular, the quality of wall drains and roots of pipelines must be carefully examined. Pipe roots must be caulked as required. The yin and yang angles should be rounded and straight and flat. 2, brushing at least two times at least two times painted waterproof: the first pass: After the base is dry, you can brush the first pass waterproof coating, the general layer of each layer brushing 2-3 times, the facade of each layer generally brushing 3-4 times. The second pass: When the first time the coating film is cured to be sticky, the second pass of the material is applied according to the first pass of the material construction method to perform the waterproof construction of the second coating film. In order to make the film thickness uniform, the direction of the squeegee must be perpendicular to the first pass. 3, closed water test 24 hours after the waterproof layer is dry, you can fill, the depth of storage should be higher than the highest point of 2-3cm, 24 hours, you can go to the neighbors downstairs to see if there is leakage; if seepage Leakage, need to be redone, must not negligence. Two, eight items Note 1. The final thickness of the waterproof film should reach 1.5mm or more. 2. The height of the bathroom wall coating is 300mm, and the height of the shower area is 1800mm. If there is a bathtub, the height of the wall adjacent to the bathtub should be 300mm higher than the height of the bathtub. The light wall is not load-bearing. It is recommended to waterproof the entire wall. At least 1800mm should be done; the height of the wall coating on the non-shower water distribution point should not be less than 1200mm. 3, kitchen floor waterproof layer should be turned up 300mm along the wall base, wash pool at the wall coating height should be 1400-1500mm, the length should exceed 400mm at both ends of the sink. 4. For balconies with waterproof requirements, the floor waterproof layer should be turned 300mm along the wall base, and the height of the waterproof coating on the walls of the laundry equipment should not be less than 1200mm. 5. Focus on brushing and waterproofing of the waterproof layer around the corners, pipes and floor drain holes. 6, the upper and lower water pipes must be cement mulch, brush up from the ground 10-20cm waterproof coating. 7. After the closed water test is completed, a cement mortar protective layer should be made on the waterproof coating layer to protect the waterproof coating and facilitate the tiling. 8, in the bathroom, kitchen, balcony and other areas that need to be waterproof, do waterproofing the trunking.

Decoration waterproof bathroom waterproof

Shower Door Knobs

Shower screen knobs, Back-to-back door knobs,glass door knobs, door knobs for glass door, bathroom door knobs

Leader Hardware Manufacturer Limited , https://www.leaderhardwarecn.com

This entry was posted in on